We gratefully acknowledge support from
the Simons Foundation and member institutions.
Full-text links:

Download:

Current browse context:

cond-mat.str-el

Change to browse by:

References & Citations

Bookmark

(what is this?)
CiteULike logo BibSonomy logo Mendeley logo del.icio.us logo Digg logo Reddit logo

Condensed Matter > Strongly Correlated Electrons

Title: Coupled wire construction of a topological phase with chiral tricritical Ising edge modes

Abstract: Tricritical Ising (TCI) phase transition is known to occur in several interacting spin and Majorana fermion models and is described in terms of a supersymmetric conformal field theory (CFT) with central charge $c=7/10$. The field content of this CFT is highly nontrivial and includes among its primary fields the Fibonacci anyon, making it of potential interest to strategies seeking to implement fault-tolerant topological quantum computation with non-Abelian phases of matter. In this paper we explore the possibility that a TCI CFT can occur at the edge of a gapped two-dimensional topological state as a stable phase. We discuss a possible realization of this 2D phase based on a coupled-wire construction using the Grover-Sheng-Vishwanath chain model of Majorana zero modes coupled to Ising spins which is known to undergo the TCI phase transition. From the combined analysis using mean-field theory, conformal field theory and density matrix renormalization group (DMRG) on 2- and 4-leg ladders, we find that the left- and right-moving gapless TCI modes become spatially separated and reside on two opposite edges of the system, forming a precursor of the required 2D topological phase.
Comments: 9 pages, 7 figures
Subjects: Strongly Correlated Electrons (cond-mat.str-el); Statistical Mechanics (cond-mat.stat-mech)
Journal reference: Phys. Rev. B 102, 165123 (2020)
DOI: 10.1103/PhysRevB.102.165123
Cite as: arXiv:2008.04438 [cond-mat.str-el]
  (or arXiv:2008.04438v2 [cond-mat.str-el] for this version)

Submission history

From: Chengshu Li [view email]
[v1] Mon, 10 Aug 2020 22:16:30 GMT (1164kb,D)
[v2] Tue, 13 Oct 2020 21:22:35 GMT (1210kb,D)

Link back to: arXiv, form interface, contact.