We gratefully acknowledge support from
the Simons Foundation and member institutions.
Full-text links:

Download:

Current browse context:

eess.SY

Change to browse by:

References & Citations

Bookmark

(what is this?)
CiteULike logo BibSonomy logo Mendeley logo del.icio.us logo Digg logo Reddit logo

Electrical Engineering and Systems Science > Systems and Control

Title: Financial Risk-Based Scheduling of Microgrids Accompanied by Surveying the Influence of the Demand Response Program

Abstract: This paper presents an optimization approach based on the mixed-integer programming (MIP) to maximize the profit of the Microgrid (MG) while minimizing the risk in profit (RIP) in the presence of demand response program (DRP). RIP is defined as the risk of gaining less profit from the desired profit values. The uncertainties associated with the RESs and loads are modeled using normal, Beta, and Weibull distribution functions. The simulation studies are performed in GAMS and MATLAB for 5 random days in a year. The simulation results show that RIP is reduced when downside risk constraint (DRC) is considered and DRP is implemented. Although DRP increases the total profit of the MG, it also notably increases the risk. On the other hand, considering DRC significantly reduces the percentage of the risk with a slight decrease in the profit.
Comments: 9 pages, 14 figures, IEEE I&CPS 2021 Conference
Subjects: Systems and Control (eess.SY)
Cite as: arXiv:2102.03470 [eess.SY]
  (or arXiv:2102.03470v1 [eess.SY] for this version)

Submission history

From: Tohid Khalili [view email]
[v1] Sat, 6 Feb 2021 01:34:51 GMT (1081kb)

Link back to: arXiv, form interface, contact.