References & Citations
Electrical Engineering and Systems Science > Systems and Control
Title: Stress-informed Control of Medium- and High-head Hydropower Plants to Reduce Penstock Fatigue
(Submitted on 5 Nov 2021 (v1), last revised 15 Mar 2022 (this version, v3))
Abstract: The displacement of conventional generation in favor of stochastic renewable requires increasing regulation duties from the remaining dispatchable resources. In high- and medium-head hydropower plants (HPPs), providing regulation services to the grid and frequently changing the plant's set-point causes water hammer, which engenders pressure and stress transients within the pressurized conduits, especially the penstock, damaging it in the long run. This paper proposes a model predictive control (MPC) that explicitly models the hydraulic transients within the penstock. It achieves to reduce the mechanical loads on the penstock wall, and, consequently, fatigue effectively. Thanks to a suitable linearization of the plant model, the optimization problem underlying the MPC scheme is convex and can be solved with off-the-shelf optimization libraries. The performance of the proposed controller is tested with numerical simulations on a 230MW medium-head HPP with Francis turbine providing primary frequency control. Simulation results show substantially reduced penstock fatigue, existing approaches outperformed, and problem resolution times compatible with real-time control requirements.
Submission history
From: Stefano Cassano [view email][v1] Fri, 5 Nov 2021 11:01:34 GMT (9994kb,D)
[v2] Thu, 10 Mar 2022 11:18:42 GMT (559kb,D)
[v3] Tue, 15 Mar 2022 13:22:28 GMT (559kb,D)
Link back to: arXiv, form interface, contact.