We gratefully acknowledge support from
the Simons Foundation and member institutions.
Full-text links:

Download:

Current browse context:

math.OC

Change to browse by:

References & Citations

Bookmark

(what is this?)
CiteULike logo BibSonomy logo Mendeley logo del.icio.us logo Digg logo Reddit logo

Mathematics > Optimization and Control

Title: Decision-Dependent Uncertainty-Aware Distribution System Planning Under Wildfire Risk

Abstract: The interaction between power systems and wildfires can be dangerous and costly. Damaged structures, load shedding, and high operational costs are potential consequences when the grid is unprepared. In fact, the operation of distribution grids can be liable for the outbreak of wildfires when extreme weather conditions arise. Within this context, investment planning should consider the impact of operational actions on the uncertainty related to wildfires that can directly affect line failure likelihood. Neglecting this can compromise the cost-benefit evaluation in planning system investments for wildfire risk. In this paper, we propose a decision-dependent uncertainty (DDU) aware methodology that provides the optimal portfolio of investments for distribution systems while considering that high power-flow levels through line segments in high-threat areas can ignite wildfires and, therefore, increase the probability of line failures. The methodology identifies the best combination of system upgrades (installation of new lines, hardening existing lines, and placement of switching devices) to provide the necessary leeway to operate the distribution system under wildfire-prone conditions. Our case study demonstrates that by modeling the DDU relationship between power flow prescriptions and line failures, investment decisions are more accurate and better prepare the grid infrastructure to deal with wildfire risk.
Subjects: Optimization and Control (math.OC)
Cite as: arXiv:2405.04350 [math.OC]
  (or arXiv:2405.04350v2 [math.OC] for this version)

Submission history

From: Felipe Piancó [view email]
[v1] Tue, 7 May 2024 14:28:04 GMT (4132kb,D)
[v2] Wed, 8 May 2024 19:19:50 GMT (4132kb,D)

Link back to: arXiv, form interface, contact.